πŸ“„Comapany Profile
☎ 058 109 4493
β˜… Abu Dhabi Β· Pool Renovation Specialists

Swimming Pool Renovation Services in Abu Dhabi

A worn-out pool does not need to be replaced β€” it needs the right renovation team. Complete pool restoration covering surface repairs, tile replacement, full resurfacing and equipment overhauls.

Residential and commercial pools of all sizes. Free site assessment and written quote. Call 058 109 4493 to book or request a free quote.

Free site visit

Get a quote in 24 hours

Tell us about your pool β€” we'll inspect and send a written, itemised quote.

ResponseSame week
Pools served500+
CoverageAll Abu Dhabi
HoursMon–Sat Β· 8–8
☎ Call 058 109 4493 βœ‰ info@imaginepools.ae
βœ“ Free site assessment
βœ“ Written itemised quote
βœ“ All work in-house
βœ“ Quality materials
Swimming Pool Renovation in Abu Dhabi
10+Years experience
Why choose us

Why Abu Dhabi Property Owners Need Professional Pool Renovation

Pools in Abu Dhabi age faster than pools in most other parts of the world. Intense UV, extreme summer heat, high mineral content in the water supply and heavy chemical treatment all accelerate wear. A pool that might need renovation after 15–20 years elsewhere can show serious deterioration within 8–12 years in Abu Dhabi.

Many property owners delay renovation because they are unsure what is involved or worried about cost. The reality is timely renovation is almost always less expensive than waiting. A crack that costs a few thousand dirhams today may compromise the entire pool shell if left for another season. Our team gives you a full picture, in plain language, with a clear written quote before any work begins.

  • βœ“ One team, one quote
  • βœ“ Specialist pool contractors
  • βœ“ In-house structural & finishing
  • βœ“ Materials suited to UAE climate
What's included

What Our Pool Renovation Service Covers

We handle every aspect in-house β€” one team, one quote, one point of contact throughout the entire renovation project.

🧱
01

Structural Repairs & Crack Fixing

We locate all cracks, investigate the cause and use specialist repair compounds and waterproofing membranes for a permanent fix.

🎨
02

Resurfacing & Replastering

Standard plaster, coloured plaster, quartz aggregate and pebble surfaces β€” quartz and pebble are particularly suited to Abu Dhabi's hard water.

✨
03

Tile Replacement & Retiling

Cracked or faded waterline tiles removed and replaced β€” individual tiles or full waterline runs, matched or updated to modern designs.

πŸͺ¨
04

Pool Deck & Surrounds

Resurface, repair and replace pool decking β€” stone, tile, composite β€” with non-slip finishes. Best coordinated with pool renovation.

βš™οΈ
05

Equipment & Plumbing Upgrades

Energy-efficient pump and filter replacement, LED lighting, heater installation and pipework repair β€” most cost-efficient while the pool is drained.

πŸ’§
06

Leak Detection & Repair

Systematic pressure testing before any repair begins, so we fix the correct problem the first time β€” no repeated failed repairs.

Process

How Our Renovation Process Works

From the first call to project handover β€” a clear, predictable timeline.

1. Assessment

Day 1


Best for

Free site visit

Includes

Inspection of pool shell, tiles, equipment and water chemistry

3. Planning

Day 4–7


Best for

Schedule & materials

Includes

Works schedule agreed, materials ordered, access confirmed

4. Renovation

7–21 days


Best for

Execution

Includes

Pool drained, all agreed renovation works carried out, full handover

Who we serve

Residential & Commercial Pool Renovation

Residential Renovation

Residential Renovation

Villa and townhouse renovation β€” typically surface work, tile replacement and equipment upgrades. Designed for minimum household disruption. Most projects complete within 7–14 working days.

Commercial Renovation

Commercial Renovation

Hotels, resorts and apartment complexes β€” phased work schedules, detailed progress reporting and priority turnaround. We have worked across Yas Island, Saadiyat Island and Al Raha Beach.

Long-Dormant Pools

Long-Dormant Pools

Pools unused for years β€” possible structural movement, scale, staining and deteriorated equipment. We inspect and address all of these during initial assessment.

Transform your tired pool

Free on-site assessment and written quote β€” same week across Abu Dhabi.

Service area

Areas We Serve Across Abu Dhabi

Our teams operate across the full Abu Dhabi emirate. If you are outside this list, contact us β€” we cover more of the UAE than any single list can capture.

πŸ“ Abu Dhabi City & Corniche πŸ“ Khalifa City πŸ“ Mohammed Bin Zayed City πŸ“ Al Reem Island πŸ“ Saadiyat Island πŸ“ Yas Island πŸ“ Al Raha Beach πŸ“ Al Ghadeer πŸ“ Musaffah πŸ“ Al Ain πŸ“ Selected Dubai locations
Office

Musaffah M-39, Office No. 12, Abu Dhabi

☎ 058 109 4493βœ‰ info@imaginepools.aeπŸ• Mon–Sat Β· 8AM–8PM
Complete range

Other Pool Services We Offer

Never deal with multiple contractors β€” we handle every aspect of your pool.

FAQ

Frequently Asked Questions About Pool Renovation

How much does swimming pool renovation cost in Abu Dhabi?

Basic restoration with resurfacing for a small residential pool starts from AED 8,000–15,000. Full renovation including structural repairs, tile replacement and equipment upgrades ranges from AED 30,000–100,000+ for larger pools. We provide a detailed written quotation after a free site assessment.

How long does swimming pool renovation take?

Simple resurfacing takes 5–7 working days. A mid-range renovation with tile replacement and minor structural repairs typically takes 10–14 working days. Full projects with structural repairs, replumbing and deck work may take 3–5 weeks.

What is the best pool resurfacing material for Abu Dhabi?

Quartz aggregate and pebble finishes significantly outperform standard plaster in Abu Dhabi's hard water and UV. Standard plaster lasts 7–10 years here. Quartz lasts 12–15. Premium pebble can last 15–20 years with proper maintenance.

Does pool renovation require draining the pool?

Yes, in most cases. Any work on the shell, surfaces, tiles or internal plumbing requires the pool to be fully drained. We assess whether full drainage is needed during the initial site visit.

Can you carry out renovation while we are living in the property?

Yes. Work is contained within the pool area. We agree working hours and site access with you before renovation begins. You do not need to leave your property.

Do you renovate old pools that have not been used for years?

Yes. Challenges include potential structural movement, extensive scale and staining and deteriorated equipment β€” all addressed during initial assessment before a comprehensive renovation quote.

Will renovation increase my property value?

A recently renovated pool is a significant asset for residential properties in Abu Dhabi. Estate agents identify a well-maintained pool as a value-adding feature; a pool in poor condition can reduce an asking price.

How do I know if my pool needs renovation or just cleaning?

Surface cracks, widespread plaster deterioration, broken tiles, persistent leaks or equipment failures across multiple systems mean renovation. If the structure and surfaces are good but water is dirty or unbalanced, regular cleaning is what you need.

Ready to bring your pool back to life?

Free site assessment and written quote within 24–48 hours β€” across Abu Dhabi.